Delta Projects

Architects ideas in to reality

We are delighted to announce the successful completion of a stunning project at Victoria Gate Shopping Centre in Leeds.

The main attraction of Victoria Gate is the arcade roof which continues the tradition of adjacent Victorian arcade glazed roofs. Working closely with our client Seele, Delta produced custom made triangular Lumera smoke vents with concealed controls that provide both smoke ventilation and summer cooling.

Custom Lumera, Leeds

Severnside EFW

Delta Ventilation have successfully completed the natural and smoke ventilation systems to Severnside EFW.

Using both EURA and EURA R ventilators with acoustic pods Delta again exceeded the design brief delivering on time and within budget. This facility will develop 32 megawatts of evergy from around 400,000 tonnes of non-recyclable waste, enough to power 50,000 homes.

Severnside

Energy from waste plant at Ferrybridge

Delta have installed a natural smoke and environmental ventilation system to all areas of this facility. The facility will have the capacity to process around 570,000 tonnes of waste per year and will be able to produce enough electricity to power around 160,000 homes.

The CEO of the Project Management company Hitachi Zosen Inova said “We are proud to deliver a plant that sets a new milestone in fuel flexibility, size and energy efficiency to our customer safely and within the expected timeframe”.

Ferrybridge

Land Rover BAR Portsmouth

A visitor centre showcasing sport, innovation, technology and sustainability is at the heart of the base, and will welcome schools and community groups. Visitors will experience the construction and on-going operation of the teams America’s Cup boats first-hand.

Delta Ventilation were selected by the design team to provide smoke ventilation to the atria and stair cores. The Delta solution was to integrate the ESTRA ventilator in to the building façade with spectacular results.

Land Rover BAR

Newcastle University - Parsons Tower

Delta Ventilation are proud to be part of the supply chain that delivered the new and improved Parsons Building at Newcastle University. The £18 million facility has undergone an amazing redevelopment and is home to the business, uniformed public services, health and care, and childcare courses.

Here the Delta solution was the integration of the ESTRA ventilator in to the building façade creating both environmental and smoke ventilation.

Newcastle University

RAF Brize Norton

Delta Ventilation have been chosen as smoke ventilation providers in the construction of a new aircraft hangar at RAF Brize Norton. Alongside main contractors Balfour Beatty and M&E Contractors NG Bailey, Delta will work on Phase 3 of the project, a 24,000m2 hangar, which will be home to the new fleet of Airbus A400 Atlas, operated by 70 Squadron at RAF Brize Norton. Here Delta have installed double flap FUMETICA ventilators to fulfil the smoke ventilation design requirement.

Brize Norton

Cheltenham Racecourse

Delta are proud to be selected as the preferred supplier for the Mechanical Smoke Extract for the new £45M flagship development at Cheltenham Racecourse for The Jockey Club.

The development creates a state-of-the-art new grandstand, increasing capacity and improving the facilities. New members’ facilities, public viewing areas, private boxes and Royal Box facilities will also be included.

Cheltenham Racecourse

Jaguar Land Rover Solihull – A Breath of Fresh Air!

Delta secured the order to provide ventilation to the Body in White facility at Jaguar Land Rover Solihull. The need: to remove diesel fumes produced by the steady stream of supply trucks for the Goods-In areas. The design solution: a matrix of fans and controls to ensure these areas are efficiently ventilated with fresh air.

Jaguar Land Rover

Essex Waste Treatment Facility – Rapid Response

Short lead times were key to meeting our client’s critical need on this project. Their project programme came under pressure and the client required 97 Duo Therma Ventilators within 3 weeks. Delta met that delivery challenge and our response ensured our client’s project programme was protected.

Duo Therma Smoke Ventilator

BSkyB – we believe in better!

BSkyB needed excellent ventilator performance and Delta’s leading louvred ventilator, the OPTIMA, was the best and obvious solution. Designed and proven to be the leading performance louvred ventilator on the market, the Optima delivers outstanding all round performance being extremely watertight, airtight at 50 Pa to 0.21m3/hour/m2 and with high insulation values from 1.0 W/m2K. At Delta, we do believe in better.

BSkyB Logo

John Lewis Distribution Centre, Milton Keynes

Delta has been successfully appointed by W T Parker to provide the ventilation solution for the new John Lewis Distribution Centre in Milton Keynes. Using the Delta EURA ventilators provided a cost effective solution to improving the environment for warehouse operatives working across multi-level mezzanine floors.

John Lewis Distribution Centre

Just what the Doctor Ordered!

We are delighted to announce the successful completion of a stunning project at The Royal College of General Practitioners HQ in central London.

The project required the installation of glazed ventilators in a near-flat structural glass roof. Delta’s Solution Team designed the resulting scheme using Lumera ventilators linked in to the building BMS. The project has been heralded a success by all with our client “delighted with the final solution”.

Lumera RCGP

Success in the Middle East

In demanding temperatures of over 50°C, Delta delivered this £600k Smoke Ventilation Solution in JAFZA Dubai.

We have now just completed the 12 months defects liability period for the CEVA Distribution Facility in JAFZA Dubai with no call outs. The Delta team delivered this £600k on time, to budget and without defects, proving our capabilities under the most demanding conditions.

JAFZA Dubai installation